The process
A fixed completion date, and every phase that gets you there.
Your completion date is agreed before we start, not estimated as we go. We run the same sequence on every job, with the same team, and we write to you every Friday to say where we are against it. Below is the whole build, phase by phase.
Phase 1
Rip out, steels and new joists
The loft is cleared, the old ceiling joists are assessed, and the steels go in to carry the new floor. Everything comes in through the loft hatch, so your landing is protected and your roof stays shut.

Phase 2
Structure signed off, floor down
Building control inspects the steels and joists before anything covers them. Once it is signed off the new floor goes down, and for the first time the space reads as a room.

Phase 3
Everything gets ready before we touch the roof
Windows ordered and delivered, the staircase measured and made, materials on site, trades booked to the day. This is the quiet stretch that means the roof is only ever worked on with everything ready and waiting.

Phase 4
The new roof structure, weathertight the same day
The new roof structure goes in and the openings are formed, and every one of them is made watertight before we walk off it. Your house is never left open, which is the reason nothing happens up here until everything else is ready and waiting.

Phase 5
First fix, wiring, plumbing, insulation
Sockets, lighting, heating and any en suite drainage go in, then the insulation. We walk the room with you before it is boarded, because moving a socket now costs nothing.

Phase 6
Plasterboard, and the staircase goes in
The one genuinely disruptive stretch downstairs, because the new stair has to break through the existing landing. It is boarded, sheeted and cleaned every evening.

Phase 7
Plaster, flooring, second fix
Skimmed, dried, floored. Doors hung, sockets and switches on, radiators live. The room stops being a build and starts being part of the house.

Phase 8
Decoration and the en suite
Painted throughout, tiling and sanitaryware in if you have gone for an en suite, and the staircase finished to match the rest of the house rather than looking bolted on.

Phase 9
Snagging, sign off, keys back
Final building control inspection and completion certificate, a walk round with you and a written snag list closed out. Then we are gone, the skip is gone, and the house is yours again.

A written update every Friday
What was done this week, what is happening next week, and anything that has changed. You never have to chase us to find out where you are.
The same faces, every day
One team from the first steel to the last coat of paint. Nobody unfamiliar turns up at your door, and nothing gets dropped between trades.
The date is fixed before we start
It goes in the proposal with the price, and the weekly timeline tracks against it. If something behind the plaster genuinely changes it, you hear that from us first and in writing, not on the day.
The promises the programme rests on
01
One team. Yours, and only yours.
A dedicated foreman on site every day, and nobody working anywhere else.
02
One fixed price, on a schedule you can read.
A written payment schedule, one payment a week, no grey areas.
03
One stress free journey.
A fixed completion date, and a house that stays liveable while we work.
What people ask about the timeline
How long does a loft conversion take?
Your completion date is agreed before we start and written into the proposal. Ten phases is the typical programme behind it, from first steel to keys back, and a bigger job carries a longer one. Weather, building control and a structure that turns out to be different behind the plaster can still move a date, and if it moves you hear it from us first, in writing.
Can we stay in the house during the work?
Yes, and most people do. For the first four phases the roof is not opened at all, so the bedrooms and the bathroom below stay in normal use. Week seven, when the new stair breaks through the existing landing, is the one genuinely disruptive week, and it is boarded, sheeted and cleaned every evening.
When does the roof actually open?
Week five, and it closes again the same week. Everything, the windows, the staircase, the materials and the trades, is on site and booked before a single tile comes off. That is deliberate, and it is the reason the roof never sits open waiting for a delivery.
How will I know what is happening?
You get a written update every Friday: what was done this week, what is happening next week, and anything that has changed. There is also a payment schedule tied to completed stages, so you can always see where your budget stands.
Want your dates in the diary?
Form, phone consultation, one appointment at the house, then your itemised proposal. That is the whole process before anyone lifts a tile.